Measurement room design stage

On site measurement room

The project housekeeper cooperates with the designer to measure the room and help the customer check the room and confirm the scheme free of charge.
Guide the customer's handling methods for the problems existing in the original house from the professional aspect, and remind the customer to know whether there is building frost, allowable construction time, elevator use, garbage stacking and transportation requirements, special provisions of the community, especially secondary handling, whether the surrounding neighbors live and special requirements, and the establishment of property relations, so as to help the customer relieve their worries.

Measurement room design stage(图1)Measurement room design stage(图2)

conceptual design

The designer will provide all-round scheme design for hard and soft clothing, intelligence, health and environmental protection in combination with the customer's demand style, so that the customer can experience a modern healthy and environmental protection life.

Measurement room design stage(图3)Measurement room design stage(图4)
Construction preparation stage

Exploration and disclosure

Contents of on-site investigation and internal disclosure:
  • Designer, product designer, engineering director, engineering housekeeper, orderer and construction manager participate in the project
  • On site drawing review
  • Confirmation of selected products and construction sub items
  • Contract disclosure and drawing joint review (if there is any problem, start work after improvement)
  • Determine whether there are additional items, and all construction partners shall participate in the on-site investigation and conduct all-round disclosure to ensure the orderly construction.
  • Invite third-party construction units (central air conditioning, floor heating, smart home, etc.) to participate in the on-site investigation

Approach protection

Hanging of safety protection and safety civilization signs; Window and door stickers; Access wall and ground protection; Arrangement of fire fighting equipment, etc. Before the formal mobilization, the original finished products of the customer shall be protected to ensure that the original finished products of the customer are finally delivered to the customer without damage.

施工准备阶段(图1)

Demolition, reconstruction and construction

Under the condition of ensuring that the original finished products of customers are protected in place, wall demolition, wall peeling, new wall construction, structural reinforcement, etc

施工准备阶段(图2)

Commencement ceremony

Invite customers to enter the house for the first time, hold the commencement ceremony and make on-site disclosure

Confirm the decoration package and construction scope
Special interpretation and point location confirmation of hydropower
Personalized re communication, clear dumb mouth cover, window cover, balcony wall, skirting line, curtain box, ceiling scheme confirmation, beautiful seam confirmation, etc
Reconfirmation of customer's special requirements, reconfirmation of customized product function schemes such as cabinets ⑤ impact of personalized content on construction period and cost ⑥ confirmation of commencement time

Approach protection

Set out according to the regulations, check and recheck the line. The unique five-step setting out presents the design scheme to the site, so that customers can experience the layout experience of the future home

施工准备阶段(图3)施工准备阶段(图4)
Hydropower construction stage
(图1)
(图2)
(图3)
(图4)
Waterproof construction stage
Waterproof construction stage(图1)

Waterproof construction

Application of waterproof coating and maintenance of key construction areas

Waterproof construction stage(图2)

Waterproof acceptance (day 15)

No less than 24h water storage test, strategic cooperation with Dongfang Yuhong company, treatment of each waterproof process node, wall corner treatment, water stop sill pouring, pipe root treatment, floor drain and sewage pipe treatment, threshold stone construction

Woodworking and bricklaying stage
木工瓦工阶段(图1)
木工瓦工阶段(图2)
Note: invite customers to enter the house for the first time, hold the commencement ceremony and make on-site disclosure

Confirm the decoration package and construction scope
Special interpretation and point location confirmation of hydropower
Personalized re communication, clear dumb mouth cover, window cover, balcony wall, skirting line, curtain box, ceiling scheme confirmation, beautiful seam confirmation, etc
Reconfirmation of customer's special requirements and reconfirmation of customized product function schemes such as cabinets
Influence of personalized content on construction period and cost
Confirm the commencement timer

木工瓦工阶段(图3)
Finished product installation stage

Mobilization of secondary main materials

Arrival of customized products and standard products (synchronous progress of materials purchased by customers)

Finished product installation stage(图1)Finished product installation stage(图2)

Finished product installation (day 65)

Kitchen cabinet, floor, door and door pocket installation and finished product protection
a professional finished product installation team ensures that each finished product installation standard is implemented, pays attention to finished product protection, and ensures that the installation is completed and the new products are handed over to customers.

Finished product installation stage(图3)Finished product installation stage(图4)
Pre acceptance stage
Pre acceptance stage(图1)

Detail acceptance

Sanitary ware, hardware lamps, switches, sockets, panel installation, etc; Primary cleaning

Pre acceptance stage(图2)

Pre acceptance

Construction manager, engineering housekeeper and designer arrive at the site for comprehensive internal inspection and pre acceptance

Pre acceptance stage(图3)

Forced finishing

Carry out cleaning work

Completion and delivery stage

Completion acceptance (the 75th day)

Complete the delivery and invite the customer to participate in the acceptance

Make an appointment to the store to experience

2523 owners have made reservations